title: Passenger lift controller, safety requirements and verification
author: Safety engineering
---
# Passenger lift controller: safety requirements and verification
**Version 3.2. Controller software release 7.4. Owner: the safety engineering lead. Assessment by the notified body on 8 June 2026.**
This sheet is the control document for the four safety requirements the controller software has to meet before a release is installed in a building. Every requirement names the method that verifies it and the evidence kept in the safety file.
## Requirements
```mermaid
requirementDiagram
requirement door_interlock {
id: 1
text: The car does not move while any landing door is open.
risk: high
verifymethod: test
}
functionalRequirement level_tolerance {
id: 1.1
text: The car stops within 10 mm of the landing before the doors open.
risk: high
verifymethod: test
}
functionalRequirement overload_hold {
id: 1.2
text: With the car above rated load the doors stay open and a message is shown.
risk: medium
verifymethod: test
}
performanceRequirement rescue_time {
id: 2
text: After a power loss the car reaches a landing on battery within 90 seconds.
risk: high
verifymethod: demonstration
}
element rig {
type: test rig
docref: SE-RIG-2026-03
}
element site_test {
type: commissioning test
docref: SE-COMM-7.4
}
element controller {
type: software
docref: controller-7.4
}
element battery_unit {
type: hardware
docref: BU-120
}
door_interlock - contains -> level_tolerance
door_interlock - contains -> overload_hold
rig - verifies -> door_interlock
rig - verifies -> level_tolerance
site_test - verifies -> overload_hold
site_test - verifies -> rescue_time
controller - satisfies -> door_interlock
battery_unit - satisfies -> rescue_time
```
## Verification and result for release 7.4
| Id | Requirement | Method | Limit | Result |
|:---|:------------|:-------|:------|:-------|
| 1 | No movement with a door open | 10,000 cycles on the rig with forced door faults | 0 movements | 0 movements in 10,000 cycles |
| 1.1 | Stop within 10 mm of the landing | 2,000 stops on the rig at rated and empty load | 10 mm | Worst case 6.2 mm |
| 1.2 | Overload holds the doors | Commissioning test at 110 per cent of rated load | Doors stay open | Passed in 12 of 12 installations |
| 2 | Rescue within 90 seconds | Commissioning test with the mains isolated | 90 s | Worst case 41 s |
## Installations covered
| Site | Lifts | Commissioned |
|:-----|------:|:-------------|
| Residential tower, 32 floors | 4 | 14 April 2026 |
| Hospital, main block | 6 | 28 April 2026 |
| Railway station, platform access | 2 | 12 May 2026 |
> [!CAUTION]
> Requirement 1 has no software-only fallback. If the door interlock input is lost the controller stops the car at the next landing and takes the lift out of service until a technician resets it on site.
## Path to the assessment
- [x] Rig tests complete, 15 May 2026
- [x] Commissioning tests on the 12 installations, 12 May 2026
- [ ] Internal review of the safety file, 1 June 2026
- [ ] Assessment by the notified body, 8 June 2026
*All organizations in the sample documents are invented. Names and figures are illustrative.*
Markdown stays unchanged by settings
PreviewWatermarked · uses no documents
Create a free account for 100 documents a month without a watermark, no card.
No preview yet
Press Create preview to see the PDF.
The PDF may differ in extra diagram pages, interactive features, and remote content.
PreviewWatermarked · uses no documents
Create a free account for 100 documents a month without a watermark, no card.